The main room has been plastered now – the external walls were dry lined first to help out a bit. It looks much smarter, but we now need to wait another week for the plaster to dry before we can get painting. Flooring is the next big ticket item – the main room’s floor apparently slopes as much as 3 inches from one side to the other, which might prove challenging.
The electrician came and finally moved the sockets to where we’d originally asked him to put them, which means that a putting up a curtain rail is once more viable.
Some of the turf cutters will be gathering the fruits of their labour this weekend, but that might change if the rain keeps up. Haven’t been up to look at our turf – I’m guessing it hasn’t stacked itself at all.